Follow the material
Describe how material leaves one machine and arrives at the next. The receiving belt, loading direction, enclosure and available maintenance access should be considered together.
Define the acceptance criteria
Agree how the installation will be evaluated under the intended operating conditions. Discuss spillage, containment and product handling with the responsible engineer. Do not substitute a generic capacity claim for a project-specific review.
This guide introduces questions and requirements for further review. It does not replace engineering assessment, equipment instructions or site safety procedures.
Further reading
CEMA: conveyor equipment resources ↗
OSHA: control of hazardous energy ↗
